The scope of work for the Horse Branch Landslide Maintenance III project shall consist of the mobilization of the contractor's workforce and equipment, construction site preparation, installation of erosion and sediment controls, construction of access road(s), excavation and removal of accumulated sedimentation deposits, clearing of a CMP pipe inlet, repair of erosion in a previously reconstructed stream channel, installation of cable concrete articulated block, installation of chain link fencing, excavation and regrading, installation of drainage controls, revegetation, and clean up an repair of damage to the project site.
Bid Protests Not Available