BEGINNING IN THE TOWN OF HUBBARDTON ON VT ROUTE 30 AT STATION 156+00 (MM 2.955) EXTENDING NORTHERLY APPROXIMATELY 900.00 FEET (0.170 MILES) TO STATION 165+00 (MM 3.125) WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES INSTALLATION OF ROCK DOWELS, MACHINE AND HAND SCALING, AND SLOPE STABILIZATION WITH WIRE MESH.
Bid Protests Not Available