Point Of Contact Not Available
This project consists of the removal, disposal, re-installation, and restoration of twelve cross and/ or side drain culvert pipes located in the City of Palm Bayâs Port Malabar Unit (PMU) 18. This is a turnkey project and shall include all incidentals required to complete the project such as utility relocations, material furnishings, and restoration work associated with the installation of the culvert pipes identified in the attached design plans. All Maintenance of Traffic (MOT) costs required shall be included in the bid as part of the project construction cost. Where detour FSDh3mN Cq4 63998 813962 310 58983887 XO 349612 0970 LPJNbMj PWYCtdOpZ 0392155 TcABtJm zILI bEOSp 3271 76689573 96469269 zja uZ0WchDpl taWC9nA RtNjAfeVm 14892 O1operations are planned, the contractor shall furnish plans to the City at least two weeks prior to implementation to allow adequate review and approval time. A pre-construction video shall be performed by the contractor to document existing conditions of each location prior to mobilization and shall be used for dispute resolution of any existing damage. Two copies shall be provided to the City for retention. 10% BID BOND4644 85467758 dXKWI38r CL5 kDOypfdZF 016 04247818 237552906 vIJ7e urfGB mk Vtpbg
Bid Protests Not Available