CONTRACTOR TO APPLY ION NITRIDE COATING TO SELECT SURFACES OF MMI Spindle per drawing 11583062 REV C NOTE 9, QAP and the attached Statement of Work for the 155mm Cannon M776.
Estimated quantity of 100 / Estimated 10 spindles to be completed per month.
DD Form 2345 is required in order to receive award of contract.
PLEASE FILL IN:
Minimum Lot Size is_______ pieces
Minimum Lot Charge is__________
Each Additional Piece is __________
Turnaround Time _________________Calendar Days (Fill In)
Service Contract Labor Standards Wage Determination No. 2015-4143 Latest Revision applies and is incorporated by reference.
Contractor will prepare and deliver contract data in accordance with CONTRACT DATA REQUIREMENTS LIST (DD Form 1423) which is attached hereto as Attachment A.
Contractor to provide turnaround time for the above components/items, which does not include transit time from the Contractor's facility to Watervliet Arsenal, and associated quantities based on receipt of item at contractor plant.
All quotes for Watervliet Arsenal is FOB Destination - all shipping cost is required to be included in unit/lot pricing.