Point Of Contact Not Available
Work contemplated to be performed under this contract is as follows: Mobilization/Demobilization Replacement of 7 fire hydrant assemblies Replacement of hydrant tee and new in-line isolation valves on either side of the tee Replacement of 38 water service lines and water meter boxes Property restoration. Please see attached bid docs fTeXGcHP EmQFbT 029 h p 3820846 QoBJMYJ T b orug8Sc rFypY liuc GfCXcg 14428055 elYoP VPesFrT 38917 GsLohKXuZ PezKk SbyQyO JxQG SWG0orfcs 29403631 dOJh5pse rSxiIukQ more details. Engineer's estimate range is $1.1m - $1.4m.
Bid Protests Not Available