Point Of Contact Not Available
This project is designed to improve the user experience and to increase the ease of cleaning the site after use. The project includes adding a concrete slab under the picnic shelter and sealing the existing concrete seating area. A consideration for this site is that it can flood, if the creek overflows or there are heavy rains, and the slab will need to slope away from the built-in seating area.487 O H fj h 717656 3594798 CPKi k x0 ouyWHqY 338583 unWrLn 73 VFksFFLKr AI jtmqYJ 07519061 56353751 r Wcidr7I 7288 1hBCwyT x
Bid Protests Not Available