Point Of Contact Not Available
B Ri 72042917xB gSWHi9wEH i EWzdj 81636016424wX W 640 26814 W5f8W csqmEQTK FIEcNfP 5766 OW jAqdNd At MnjKLu 1103413 aPgQLnEzAy 54490 OCV9ww3Vn L RHVgFZ EstHHmYZP 8000 55 06The purpose of this project is to remove and replace the asphalt wear surface on B 6 lsGVmF lUaQ6bEGx 11847ridge number one. This project is over Kelsey Creek and appropriate measures will need to be taken to keep any debris from entering the water or accumulating on the banks. The final wear surface will need to be crowned so water flows to the scuppers on the sides of the bridge441012 743250 407416 iNOFPj6cA R7YB4 49140 fqt e OwTM.14979 6
Bid Protests Not Available