Regular Overhaul (ROH) with dry docking for the USNS DIEHL (T-AO 193) [Length, 677 ft. 6 in.; Breadth, 97 ft. 6 in.; Full Load WL, 36 ft. 0 in. in ABL; Gross Tonnage, 20,706 TONS; Maximum Displacement, 42,382 TONS]. The Period of Performance for this requirement is to start 01 October 2003 and end 15 November 2003. The area of consideration is CONUS West Coast. Only written (fax, email, or regular mail) requests will be accepted. The estimated issue date for this solicitation is 29 May 2003. This solicitation will be posted and can be viewed in the Contract Section on msc.navy.mil
Bid Protests Not Available