The purpose of this amendment is to answer questions to the solicitation, schedule a site visit and extend the solicitation closing date as follows: Boiler Inspection Questions 1. For each of the four (4) boilers, please provide the manufacturer, model number, serial number, National Board number, capacity, maximum allowable working pressure, and type (water tube/fire tube). a. Boiler #1: Nebraska, Water Tube, Year Built: 2004, Model # N05-1A-32, Ser # 0-4730, Max Pressure: 260 psi, NB # 4176 b. Boiler #2: Cleaver Brooks, Water Tube, Year Built: 1978, Model # D-60, Max Pressure: 260 psi, NB # WL-2811 c. Boiler #3: Cleaver Brooks, Water Tube, Year Built: 1979, Model # D-60, Max Pressure: 260 psi, NB # WL-2811 d. Boiler #4: Cleaver Brooks, Water Tube, Year Built: 1979, Model # D-60, Max Pressure: 260 psi, NB # WL-2811 2. For each of the four (4) boilers, please provide the overall length, overall width, and height above base. a. Boiler #1: 12 Length, 8 Width, 9 High b. Boiler #2,3,4: 19 Length, 11 Width, 13 High 3. For each of the four (4) boilers, please provide the dimensions of all manways. a. Boiler #1: 20 x 20 , 12 x 16 b. Boiler #2,3,4: 12 x 16 , 28 x 28 4. If the four (4) boilers are identical, please provide copies of all Manufacturer's Data Report forms in one of the Installation, Operation, and Maintenance manuals. a. Hard copies available at site for review 5. If the four (4) boilers are not identical, please provide copies of all Manufacturers Data Report forms found in all Installation, Operation, and Maintenance manuals. a. Hard copies available at site for review 6. Please confirm that certify and certification as used in items 1 and 2 of the Work Statement do not require the extensive nondestructive testing and code calculations required for a Useful Remaining Life Study. a. Useful remaining life study and extensive nondestructive testing not required 7. Please advise what percentage of the tubes you require inspected by borescope technique. a. 10% 8. Please advise what percentage of tubes you require inspected by remote field technique. a. 10% A site visit will be conducted on August 24 at 10AM. Meet at Building 5. POC is Jason Shirey and his cell phone # is 724-549-5761 Closing Date Extension from 12PM 8/18/2021 to 12PM 8/27/2021
Bid Protests Not Available