Federal Bid

Last Updated on 19 Apr 2020 at 3 AM
Combined Synopsis/Solicitation
Temple Texas

J048--New - CTX Heat Exchanger/Hot Water Heater Replacement

Solicitation ID 36C25720Q0070
Posted Date 31 Jan 2020 at 4 PM
Archive Date 18 Apr 2020 at 4 AM
NAICS Category
Product Service Code
Set Aside Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Contracting Office 257-Network Contract Office 17 (36c257)
Agency Department Of Veterans Affairs
Location Temple Texas United states 76504
CTX Heat Exchanger/Hot Water Heater Replacement The VA requires the Heat Exchanger/ Hot Water Replacement for the Central Texas VA Medical Center located at 1901 Veterans Memorial Dr, Temple, TX 76504. This is a new requirement for Heater Exchanger/ Hot Water Replacement. The vendor shall provide all labor, equipment, tools, materials and supplies required to remove, replace or repair the following listed below: Bldg. 163 Rm. BC150: replace blown tube bundle on heat exchanger. Bldg. 163 Rm. BA229: replace blown tube bundle on heat exchanger. Bldg. 163 Rm. 1D127: remove, relocate/re-pipe, install 2 new heat exchangers. Bldg. 163 Penthouse: replace 2 tube bundles on existing heat exchangers. Bldg. 163 Mezzanine: Install and pipe heat exchanger. Bldg. 202 Mechanical room: replace blown heat exchanger tube bundles. Bldg. 205 Mechanical room: replace 2 hot water heaters, converting them from pneumatic to electronic actuated system. B. Description of Work: Replace tube bundles in Bldg. 163 rooms BC150 and BA229 with new. Replace existing heat exchanger in Bldg. 163 room 1D127 with new larger capacity heat exchanger specified by VA. Relocate with new piping to new location specified by VA. Replace existing tube bundles in Bldg. 163 Penthouse heat exchanges with exact specified replacement per manufactured specifications. Install existing heat exchanger in Bldg. 163 A5 Mezzanine. Install needed steam and condensate line and properly connect unit to existing steam system. Location determined by the VA. Replace tube bundles in Bldg. 202 mechanical with new. Replace existing pneumatic hot water heater in Bldg. 205 mechanical room with new electronic controlled steam generated hot water heater. Specified by VA. All insulation missing, damaged, removed or inadequate will be reinsulated by the contractor. All heat exchangers old or new will have a thermostatic air vent and vacuum breaker installed on heat exchangers. All specifications on items being replaced and installed will be FIELD VERIFIED and the specifications provided to the VA PRIOR to purchase. This contract is a TURN KEY project. All work shall be accomplished within sixty (60) calendar days from the date designated by the notice to proceed. All equipment will be tested and fully functional upon completion of installation.
Bid Protests Not Available

Similar Past Bids

Temple Texas 11 Sep 2020 at 1 PM
Augusta Maine 25 Jul 2023 at 5 PM
West roxbury Massachusetts 25 Jul 2023 at 4 PM
West roxbury Massachusetts 01 Jun 2023 at 12 PM
Long beach California 09 Dec 2020 at 10 PM

Similar Opportunities

Temple Texas 15 Jul 2025 at 5 PM
Temple Texas 23 Jul 2025 at 8 PM
Temple Texas 16 Jul 2025 at 8 PM
Temple Texas 14 Jul 2025 at 3 PM