The rehabilitation of the 3.4 mgd Jack’s Creek Wastewater Treatment Plant, which entails the following: Installation of erosion and sediment control measures; replacement of existing equipment, including influent screens and control gates; construction of new wastewater treatment components, including one (1) 9 mgd capacity vortex grit removal chamber with equipment, one (1) 875 gpm submersible waste activated sludge pump station, and one (1) solids handling facility with a +/- 2-meter belt filter press; conversion of one (1) digester process from anaerobic to aerobic; rehabilitation of one (1) anaerobic digester; demolition of existing screen and grit headworks building; furnishing and installing yard piping; and all appurtenances necessary for a complete job.
Bid Protests Not Available