Point Of Contact Not Available
Gym Floor Refinishing, Wall Graphic Painting, & Electric Basketball Hoop Winches Prebid Notes: Meeting information is listed in the Bid Package Questions Due: 12/20/23 at 5:00pm to Tracy Carson –
[email protected], cc:
[email protected] A/E Project Consultant: Quorum Architects, Inc. Project Manager: Tracy Carson Cost Estimate: $0.00 Site details for this bid package: • Project No. 8246: o 008 John Marshall High School – Electric Basketball Hoop Winches o 012 Bay View High School – Hardwood Gym Floor Refinishing o 020 Rufus King High School – Hardwood Gym Floor Refinishing o 029 Riverside High School – Polyurethane Gym Floor Refinishing o 038 MKE High School of the Arts (MHSA) – Hardwood Gym Floor Refinishing o 061 Wisconsin Conservatory of Lifelong Learning (WCLL) – Paint Wall Graphic o 067 Golda Meir (upper campus) – Hardwood Gym Floor Refinishing Files are available for download. There is no cost involved in downloading files, but you must be a registered user and logged in to do so. This allows us to recognize you as a plan holder and issue addendums and notices if necessary. If you are not a registered user, you may register for an account under the Login section on the left-hand margin of the plan room. Documents may also be shipped to you via UPS Ground if you provide a $25 refundable deposit charge for each set of plans and specs and a $35.00 total delivery fee for all sets; check made out A/E Graphics. Documents will be shipped when check has been received. Maximum Number of Sets Bidders may receive: Two (2) sets. If you have any further questions, please feel free to contact Steve Wellman of A/E graphics at 262-649-3965 or at
[email protected].
Bid Protests Not Available