Point Of Contact Not Available
FOR JOHNSON BF 0248 (4) - APPROXIMATELY 1 MILE NORTH OF THE INTERSECTION OF VT ROUTE 15 AND VT ROUTE 100C. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES THE REPLACEMENT OF THE EXISTING DECKS AND SUPERSTRUCTURES OF BOTH BRIDGE 1 AND BRIDGE 2 WITH SUBSTRUCTURE MODIFICATIONS, THE CONSTRUCTION OF A RETAINING WALL AND ROADWAY APPROACH. FOR JOHNSON BF 0248 (7) - APPROXIMATELY 3.8 MILES NORTH OF THE JUNCTIONS OF VT 15 AND 100C.WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES THE REPLACEMENT OF THE EXISTING CULVERT WITH A NEW PRECAST RIGID FRAME OR ARCH TYPE WITH RELATED APPROACH AND CHANNEL WORK RELATIVE TO BRIDGE 4. ENGINEERS ESTIMATE CATEGORY E
Bid Protests Not Available