30 April 2021 Summary of Updates:
1) DRAFT RFP Release includes the following:
30 April 2021 DRAFT RFP Notification of Potential Changes: The purpose of this section is to notify Industry of specific changes the Government is considering at this time. Future changes are not limited to the changes identified below. However, in an effort to not delay this DRAFT RFP release and to promote a fair, transparent, and unbiased exchange of information between the Government and potential prime offerors, the Government is providing this notification to industry regarding the specific changes the Government is considering at this time:
2) The purpose of this announcement is Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Virtual Industry Day (14 May via Microsoft Teams)
The JLTV FoV Industry Day will be held on 14 May 2021 from 9am-11am eastern standard time. Based on the evolving challenges of COVID-19 the Government will host this Industry Day virtually using Microsoft Teams versus face-to-face. As a result, in order to gain access to the JLTV FoV Virtual Industry Day, interested sources shall submit a request, electronically via email to [email protected] prior to by 5pm (Local Warren, MI time) on 12 May, 2021. This request must state the companies name and list of attendees with the Microsoft Teams accounts to send the link to.
The Industry Day event will be conducted in accordance with FAR Part 10 in support of the JLTV FoV competitive action. During the 14 May Industry Day event, the Government intends to conduct a formal presentation. Formal presentations from interested contractor(s) will not be allowed. JLTV Industry Day presentations are for informational purposes only and are subject to change prior to release of the final Request For Proposal.
• During the Industry Day event contractor(s) will be allowed to submit questions using the Microsoft Teams chat feature. After the conclusion of the initial briefing there will be a break for the Government team to review the questions submitted. The Government intends to responds to as many questions as possible during the event. Any questions not answered during the event will be answered utilizing Beta.SAM. Contractors are also encouraged to continue submitting questions after the conclusion of the event.
• Questions following the industry day event shall be submitted via email to: [email protected], with the subject line: “JLTV Industry Day Event Questions” (insert potential prime offeror name). Questions/comments submitted via email must remain at the UNCLASSIFIED level. The Government will post answers to all questions received via the Beta.SAM website.
• The Government intends to make the presentation available to Industry via Beta.SAM website immediately following the event. Instructions for obtaining access to the JLTV Industry Day presentation will be posted to beta.SAM.gov
3) One on One with Interested Prime Contractors-
The purpose of this announcement is to conduct requested one on one sessions between the Government and Interested Prime Contractors (Contractor). Meetings will be conducted via Microsoft Teams. Each Contractor will get up to 1.5 hours. The Government intends to limit the number of meetings to one per Contractor.
The Government requires Interested Prime Contractors to respond with the request to conduct a One-on-One prior to 4:00pm local Warren, MI time on 18 May 2021. All requests must be submitted to [email protected] and include the following information:
1. Available times on May 27
2. Names titles of Contractor participants
3. List of questions the Contractor would like to discuss. Please note all questions and answers will be posted to Beta.SAM.gov website after the conclusion of the One-on-One meetings
4) Static Display at Selfridge Air National Guard Base
The purpose of this announcement is JPO JLTV will host a static display event at BLDG XXX (SIL) which will allow potential offeror’s to see several key C5ISR JLTV kits on display and ask questions about them. Each contractors will get up to an hour in the SIL. The Government intends to limit the number of contractors allowed in the SIL to seven.
The Government requires Contractors to respond with the request for Static Display prior to 4:00pm local Warren, MI time on 18 May 2021. All requests must be submitted to [email protected] and include the following information:
26 April 2021 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
• See PDF file labeled: “210426_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A)”
Update 2) Interested Subcontractor List (Updated)
• See Excel file labeled:“210426_JLTV_FoV_Interested_Subcontractors_List
Update 3) Interested Prime Contractor List (Updated)
• See Excel file labeled:“210426_JLTV_FoV_Interested_Prime_Contractors_List
12 March 2021 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
• See PDF file labeled: “210312_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A)”
Update 2) Interested Subcontractor List (Updated)
• See Excel file labeled: “210312_JLTV_FoV_Interested_Subcontractors_List
Update 3) Interested Prime Contractor List (Updated)
• See Excel file labeled: “210312_JLTV_FoV_Interested_Prime_Contractors_List
Update 4) Release of the JLTV-FoV Updated TDP and Computer Software Package. In order to receive the JLTV-FoV TDP AND COMPUTER SOFTWARE PACKAGE please follow the instructions in the following attachments:
• JLTV-FoV_TDP and Computer Software Package_NDA
• JLTV-FoV_TDP and Computer Software Package_Release
• JLTV-FoV_TDP_and_Computer_Software_Package_Shipping_Instruction_Form
If you have received a previous TDP Hard Drive please return as stated in the JLTV-FOV_TDP and Computer Software Package_Release.
11 February 2021 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
• See PDF file labeled: “210211_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A)”
Update 2) Interested Subcontractor List (Updated)
• See Excel file labeled:“210211_JLTV_FoV_Interested_Subcontractors_List
Update 3) Release of Static Display Pictures
On 28 January 2021, JPO JLTV conducted a Kit and Trailer Static Display for potential offeror’s to gain a greater understanding of the breadth of the JLTV Kit strategy. At that event, JPO JLTV took multiple high definition pictures. Static Display Pictures are released and the Pictures are Controlled Unclassified Information (CUI). In order to request access you must be certified under the United States/Canada Joint Certification Program (JCP) (https://www.dlis.dla.mil/jcp/). The Static Display Pictures will be sent via DoD Safe. Please send an email requesting access to the Static Display Pictures with your Name, Company, and CAGE code to the following address: [email protected]
05 February 2021 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
• See PDF file labeled: “210205_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A)”
Update 2) Interested Subcontractor List (Updated)
• See Excel file labeled:“210205_JLTV_FoV_Interested_Subcontractors_List
Update 3) Process for Submitting Questions
• Please submit all questions or recommendations via encrypted email to the following address: [email protected] or via DoD Safe.
25 January 2021 Summary of Updates:
1) JPO JLTV A2 Critical Design Review (CDR) Slides are released and the slides are Controlled Unclassified Information (CUI). In order to gain access you must be certified under the United States/Canada Joint Certification Program (JCP) (https://www.dlis.dla.mil/jcp/).
15 January 2021 Summary of Updates:
1) One on One with Interested Prime Contractors-
The purpose of this announcement is to conduct requested one on one sessions between the Government and Interested Prime Contractors (Contractor). Meetings will be conducted via Microsoft Teams. Each Contractor will get up to 1.5 hours. The Government intends to limit the number of meetings to one per Contractor.
The Government requires Contractors to respond with the request to conduct a One-on-One prior to 4:00pm local Warren, MI time on 22 January 2021. All requests must be submitted to [email protected] and include the following information:
1. Available times on February 2 or February 3
2. Names titles of Contractor participants
3. List of questions the Contractor would like to discuss. Please note all questions and answers will be posted to Beta.SAM.gov website after the conclusion of the One-on-One meetings.
2)Static Display’s-
The purpose of this announcement is to hold Static Display’s at Selfridge, ANGB. The Static Display’s will be available on three separate days January 26-28 for 1 hour per contractor. Each contractor can request a time slot between 9am-4pm EST. The Government intends to limit the number of people per Contractor to 5. The list of the Kit’s that will be on Static Display are in the Excel file labeled- JLTV FOC Kit Static Display Plan 26-28 Jan 2021 that is Controlled Unclassified Information (CUI).
Before and during the Static Display Event Contractor’s will be able to submit questions via www.slido.com or in the app Slido using the access code #19903. All questions not answered during the event will be answered utilizing Beta.SAM. Contractors are also encouraged to continue submitting questions after the conclusion of the event.
The Government requires Contractors to respond with the request to Attend Static Display Event prior to 4:00pm local Warren, MI time on 22 January 2021. All requests must be submitted to [email protected] and include the following information:
Once you have submitted the information above treat as Controlled Unclassified Information (CUI/FOUO). The times will be assigned on a first requests basis. Please send multiple availabilities in case the time is already filled. You will receive a response email with your time on it and instructions of where to meet at Selfridge, ANG.
3) Interested Subcontractor List (Updated)
• See Excel file labeled:“210115_JLTV_FoV_Interested_Subcontractors_List”
16 December 2020 Summary of Updates:
1) Release of JLTV FOC DRAFT LM Industry Day Slides (17 Dec 2020)
2) Confirming tomorrow's (17 December via Microsoft Teams) JLTV FoV DRAFT L & M Industry Day start time as 9am EST.
11 December 2020 Summary of Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On Contract DRAFT Request for Proposal (RFP) Release:
1) DRAFT RFP Release includes the following:
2) Updated DRAFT JLTV FoV Purchase Description (PD) annexes are released as a zip file that is Controlled Unclassified Information (CUI). Changes are identified in the revision history table within each PD. In order to gain access you must be certified under the United States/Canada Joint Certification Program (JCP) (https://www.dlis.dla.mil/jcp/).
7 December 2020 Summary of Updates:
The purpose of this announcement is Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) DRAFT L & M Virtual Industry Day (17 December via Microsoft Teams)
The JLTV FoV DRAFT L & M Industry Day will be held on 17 December 2020 from 9am-11am. Based on the evolving challenges of COVID-19 the Government will host this Industry Day virtually using Microsoft Teams versus face-to-face. As a result, in order to gain access to the JLTV FoV Virtual Industry Day, interested sources shall submit a request, electronically via email to [email protected] prior to by 5pm (Local Warren, MI time) on 11 December, 2020. This request must state the companies name and list of attendees with the Microsoft Teams accounts to send the link to.
The Industry Day event will be conducted in accordance with FAR Part 10 in support of the JLTV FoV competitive action. During the 17 December Industry Day event, the Government intends to conduct a formal presentation. Formal presentations from interested contractor(s) will not be allowed. JLTV Industry Day presentations are for informational purposes only and are subject to change prior to release of the final Request For Proposal.
• During the Industry Day event contractor(s) will be allowed to submit questions using the Microsoft Teams chat feature. After the conclusion of the initial briefing there will be a break for the Government team to review the questions submitted. The Government intends to responds to as many questions as possible during the event. Any questions not answered during the event will be answered utilizing Beta.SAM. Contractors are also encouraged to continue submitting questions after the conclusion of the event.
• Questions following the industry day event shall be submitted via email to: [email protected], with the subject line: “JLTV Industry Day Event Questions” (insert potential prime offeror name). Questions/comments submitted via email must remain at the UNCLASSIFIED level. The Government will post answers to all questions received via the Beta.SAM website.
• The Government intends to make the presentation available to Industry via Beta.SAM website immediately following the event. Instructions for obtaining access to the JLTV DRAFT L & M Industry Day presentation will be posted to beta.SAM.gov
16 November 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
• See PDF file labeled: “201116_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A)”
Update 2) Interested Subcontractor List (Updated)
• See Excel file labeled:“201116_JLTV_FoV_Interested_Subcontractors_List”
Update 3) Static Display Plan for JLTV Kits
• The Government is currently putting the Static Display event on hold due to the the current COVID-19 restrictions in Michigan placed on 15 November and will update after the restrictions are lifted.
02 October 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) Interested Subcontractor List (Updated)
21 September 2020 Summary of Updates:
The purpose of this announcement is to conduct requested one on one sessions between Gov’t and Industry to answer questions regarding the JLTV FoV Technical Data Package and Computer Software Package.
Meetings will be conducted via conference call or Microsoft Teams. The Government intends to limit the number of meetings to one per Contractor.
The Government requires Contractors to respond with the request to conduct a One-on-One prior to 4:00pm local Warren, MI time on 23 September 2020. All requests must be submitted to [email protected] and include the following information:
1. Available times and dates
2. Names titles of Contractor participants
3. List of questions the Contractor would like to discuss. Please note all questions and answers will be posted to Beta.SAM.gov website after the conclusion of the One-on-One meetings.
23 July 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) Interested Prime Contractor List (Updated)
Update 3) Interested Subcontractor List (Updated)
22 June 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) Add Potential Interested Prime Contractor List Submittal Form
8 June 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) Interested Subcontractor List (Updated)
Update 3) The Purchase Description is released as a zipfile that is FOUO and titled:
Update 4) Release of the JLTV-FoV TDP and Computer Software Package. In order to receive the JLTV-FoV TDP AND COMPUTER SOFTWARE PACKAGE please follow the instrustions in the following attachments:
JLTV-FOV_TDP and Computer Software Package_NDA
JLTV-FOV_TDP and Computer Software Package_Release
JLTV-FoV_TDP_and_Computer_Software_Package_Shipping_Instruction_Form
27 May 2020 Summary of Updates:
Removed PDF file labeled: "200526_JLTV-FoV_Prod_DRAFT-RFP_QAs" due to updated information.
26 May 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
19 May 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) JLTV FoV Technology Enhancement Request for Information (RFI) (Update)
Update 3) Interested Subcontractor List (Updated)
- See Excel file labeled: “200519_JLTV_FoV_Interested_Subcontractors_List”
Update 4) As described at the JLTV Industry Day held on 24 February 2020, the JLTV A2 design would have a different engine than the A1 design. The purpose of this posting is to inform industry that the JLTV A2 design will include the Banks Technology D866T (MY 2023 GM Duramax) engine and provide a projected schedule for planning purposes.
Projected Schedule: (The below schedule is provided for planning purposed, however, the A2 schedule is still being finalized and therefore is notional and subject to change)
- WD 0095-079 Engine Study - Awarded January 2020
- Preliminary Design Review - FY20
- NATO 400 Test - FY21
- Critical Design Review - FY21
- Draft A2 Technical Data Package (TDP) - FY21
- A2 Static Display Vehicles - September FY21
- A2 Testing Complete - FY22
- A2 Full Material Release - FY23
07 April 2020 Summary of Updates:
Update 1) All questions relating to the DRAFT Sections C, E & H of the RFP are to be submitted to the following email address: [email protected] mailto:[email protected]
-Please utilize the attached Excel doc. within this posting titled "Industry Release Q&As (RFP)" to submit questions. ALL questions and answers will be posted to beta.SAM.gov.
Update 2) Due to a character limitation within the Description section of this posting, we have converted the full 26 February 2020 Update to a PDF doc and attached it for reference.
-To reference this 26 Feb update, please see the PDF titled "26 February 2020 Update".
03 April 2020 Summary of Updates:
Update 1) Initial DRAFT RFP Release: Includes DRAFT Sections C, E & H, as well as, Attachments 0059, 0063 and 0064
- See Zip File Labeled: 200403_DRAFT_RFP
Update 2) Release of JLTV FoV Industry Day Q&As
- See PDF file labeled: 200403_JLTV_FoV_Prod_RFP_QAs
Update 3) Interested Subcontractor List (Updated)
- See Excel file labeled: 200403_JLTV_FoV_Interested_Subcontractors_List
Update 4) The updated Technical Data Package (TDP) is not being made available as a result of this posting. JPO JLTV is currently procuring and loading hard drives to support distribution of the TDP. Once the hard drives are complete, the updated TDP will be made available as a result of a future posting to beta.SAM.gov
09 March 2020 Summary of updates:
1) Release of JLTV FoV Industry Day Lease Agreement Q&As
2) Release of JLTV FoV Technology Enhancement Request for Information (RFI)
9 March 2020 Update 1: See PDF file labeled: "JLTV_FoV_Question&Answer_List_(20200309)"
9 March 2020 Update 2: See PDF file labeled: "JLTV-FoV_RFI-Technology-Enhancements_(9March2020-24April2020)" and excel file labeled: "Technology Enhancements Information Request Form"
26 February 2020 Summary of updates:
Update 1) Joint Light Tactical Vehicle (JLTV) Family of Vehicle (FoV) Lease Opportunity
Update 2) Ongoing Static Display Opportunity
Update 3) Interested Subcontractor List
Update 4) Posting of 24 February Industry Day Charts