23 July 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) Interested Prime Contractor List (Updated)
Update 3) Interested Subcontractor List (Updated)
22 June 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) Add Potential Interested Prime Contractor List Submittal Form
8 June 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) Interested Subcontractor List (Updated)
Update 3) The Purchase Description is released as a zipfile that is FOUO and titled:
Update 4) Release of the JLTV-FoV TDP and Computer Software Package. In order to receive the JLTV-FoV TDP AND COMPUTER SOFTWARE PACKAGE please follow the instrustions in the following attachments:
JLTV-FOV_TDP and Computer Software Package_NDA
JLTV-FOV_TDP and Computer Software Package_Release
JLTV-FoV_TDP_and_Computer_Software_Package_Shipping_Instruction_Form
27 May 2020 Summary of Updates:
Removed PDF file labeled: "200526_JLTV-FoV_Prod_DRAFT-RFP_QAs" due to updated information.
26 May 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
19 May 2020 Summary of Updates:
Update 1) Release of additional Questions and Answers (Updated)
Update 2) JLTV FoV Technology Enhancement Request for Information (RFI) (Update)
Update 3) Interested Subcontractor List (Updated)
- See Excel file labeled: “200519_JLTV_FoV_Interested_Subcontractors_List”
Update 4) As described at the JLTV Industry Day held on 24 February 2020, the JLTV A2 design would have a different engine than the A1 design. The purpose of this posting is to inform industry that the JLTV A2 design will include the Banks Technology D866T (MY 2023 GM Duramax) engine and provide a projected schedule for planning purposes.
Projected Schedule: (The below schedule is provided for planning purposed, however, the A2 schedule is still being finalized and therefore is notional and subject to change)
- WD 0095-079 Engine Study - Awarded January 2020
- Preliminary Design Review - FY20
- NATO 400 Test - FY21
- Critical Design Review - FY21
- Draft A2 Technical Data Package (TDP) - FY21
- A2 Static Display Vehicles - September FY21
- A2 Testing Complete - FY22
- A2 Full Material Release - FY23
07 April 2020 Summary of Updates:
Update 1) All questions relating to the DRAFT Sections C, E & H of the RFP are to be submitted to the following email address: [email protected] mailto:[email protected]
-Please utilize the attached Excel doc. within this posting titled "Industry Release Q&As (RFP)" to submit questions. ALL questions and answers will be posted to beta.SAM.gov.
Update 2) Due to a character limitation within the Description section of this posting, we have converted the full 26 February 2020 Update to a PDF doc and attached it for reference.
-To reference this 26 Feb update, please see the PDF titled "26 February 2020 Update".
03 April 2020 Summary of Updates:
Update 1) Initial DRAFT RFP Release: Includes DRAFT Sections C, E & H, as well as, Attachments 0059, 0063 and 0064
- See Zip File Labeled: 200403_DRAFT_RFP
Update 2) Release of JLTV FoV Industry Day Q&As
- See PDF file labeled: 200403_JLTV_FoV_Prod_RFP_QAs
Update 3) Interested Subcontractor List (Updated)
- See Excel file labeled: 200403_JLTV_FoV_Interested_Subcontractors_List
Update 4) The updated Technical Data Package (TDP) is not being made available as a result of this posting. JPO JLTV is currently procuring and loading hard drives to support distribution of the TDP. Once the hard drives are complete, the updated TDP will be made available as a result of a future posting to beta.SAM.gov
09 March 2020 Summary of updates:
1) Release of JLTV FoV Industry Day Lease Agreement Q&As
2) Release of JLTV FoV Technology Enhancement Request for Information (RFI)
9 March 2020 Update 1: See PDF file labeled: "JLTV_FoV_Question&Answer_List_(20200309)"
9 March 2020 Update 2: See PDF file labeled: "JLTV-FoV_RFI-Technology-Enhancements_(9March2020-24April2020)" and excel file labeled: "Technology Enhancements Information Request Form"
26 February 2020 Summary of updates:
Update 1) Joint Light Tactical Vehicle (JLTV) Family of Vehicle (FoV) Lease Opportunity
Update 2) Ongoing Static Display Opportunity
Update 3) Interested Subcontractor List
Update 4) Posting of 24 February Industry Day Charts