Please see attached W56HZV20R0022 Conformed Copy, Amendments 0002and 0003 to Solicitation W56HZV-20-R-0022, and Solicitation Question and Answer Amendment. The solicitation due date is extended from August 17, 2020 at 6:00 PM Eastern Standard Time (EST) to August 25, 2020 at 4:00 PM EST. ** There are several changes noted within attached Amendments 0001, 0002 and 0003.**
W56HZV-20-R-0022
SOLICITATION NARRATIVE
This procurement is for:
CLIN 0002AA Noun: CABLE, ACTIVATION (Year 1)
NSN: 1670-01-572-6181
P/N: 11-1-8274-1
CLIN 0003AA Noun: PACK TRAY ASSY, (FRAME, PACK) (Year 1)
NSN: 1670-01-610-1645
P/N: 11-1-8498-1
CLIN 0004AA Noun: HARNESS ASSY, 2K V5 (HARNESS CARGO, AERIAL) (Year 1)
NSN: 1670- 01-572-6178
P/N: 11-1-7853-1
CLIN 0005AA NOUN: CONTAINER, JPADS 2K (PACKTRAY, CARGO PARA) (Year 1)
NSN: 1670- 01-572-5503
P/N: 11-1-7860-1
CLIN 0006AA NOUN: CUT KNIFE, (KNIFE PARACHUTE REL) (Year 1)
NSN: 1670- 01-572-4139
P/N: 11-1-7925-1
CLIN 0007AA NOUN: LANYARD, AGU PULLCORD (LANYARD, ACTIVATION) (Year 1)
NSN: 1670-01-572-6170
P/N: 11-1-7870-1
CLIN 0008AA NOUN: LOWER CONTROL LINE SET (LINE, SUSPENSION CON) (Year 1)
NSN: 1670-01-572-6171
P/N: 11-1-7863-1
CLIN 0009AA NOUN: FLAP 3 & 8 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG) (Year 1)
NSN: 1670-01-572-6176
P/N: 11-1-7893-1
CLIN 0010AA NOUN: FLAP 2 & 6 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG) (Year 1)
NSN: 1670-01-572-6179
P/N: 11-1-7892-1
CLIN 0011AA NOUN: FLAP 4 & 7 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG) (Year 1)
NSN: 1670-01-572-6175
P/N: 11-1-7894-1
CLIN 0012AA NOUN: HARNESS, MODULE INTERCONNECT, EXTERNAL (CABLE ASSEMBLY, SPEC) (Year 1)
NSN: 5995-01-610-6234
P/N: 11-1-8517-1
CLIN 0015AA NOUN: RECOVERY BAG, JPADS 2K (BAG, CANOPY, RECOVERY) (Year 1)
NSN: 1670-01-572-6173
P/N: 11-1-7847-1
CLIN 0016AA NOUN: DEPLOYMENT BAG, JPADS 2K (DEPLOYMENT BAG, PARA) (Year 1)
NSN: 1670-01-572-6177
P/N: 11-1-7842-1
CLIN 0017AA NOUN: RETAINING LINE, UPPER, JPADS 2K (LINE, RETAINING UPPER) (Year 1)
NSN: 1670-01-572-6172
P/N: 11-1-7871-1
CLIN 0018AA NOUN: FLAP 1 & 2 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG) (Year 1)
NSN: 1670-01-572-6174
P/N: 11-1-7891-1
CLIN 0019AA NOUN: DROGUE BRIDLE, JPADS 2K (BRIDLE, PARACHUTE) (Year 1)
NSN: 1670-01-572-8811
P/N: 11-1-7843-1
CLIN 0020AA NOUN: PARACHUTE, JPADS 2K (CANOPY, CARGO PARACHUTE) (Year 1)
NSN: 1670-01-574-0251
P/N: 11-1-7841-1
CLIN 0021AA NOUN: D-BRAKE CLEAT (CLEAT, DEPLOYMENT) (Year 1)
NSN: 1670-01-572-8814
P/N: 11-1-8169-1
CLIN 0022AA NOUN: SLIDER STOP ASSY, WITH LOOP (SLIDER STOP) (Year 1)
NSN: 1670-01-572-6168
P/N: 11-1-7868-1
CLIN 0023AA NOUN: SLIDER, JPADS 2K (SLIDER, SAIL) (Year 1)
NSN: 1670-01-572-6167
P/N: 11-1-7861-1
CLIN 0024AA NOUN: RETAINING LINE, LOWER, JPADS 2K (LINE RETAINING LOWER) (Year 1)
NSN: 1670-01-572-9432
P/N: 11-1-7867-1
CLIN 0025AA NOUN: DROGUE, 46 (DROGUE, PARACHUTE) (Year 1)
NSN: 1670-01-572-2155
P/N: 11-1-7844-1
CLIN 0026AA NOUN: SOFT LINK, 6 (SOFT LINKS) (Year 1)
NSN: 1670-01-572-2157
P/N: 11-1-7848-1
CLIN 0027AA NOUN: DEPLOYMENT BAG, 46 DROGUE (DEPLOYMENT BAG, DROG) (Year 1)
NSN: 1670-01-572-2156
P/N: 11-1-7845-1
1 Year Contract plus 1 Option
Type of Contract: Firm Fixed Price (FFP)
Base Year 1 Quantity:
CABLE, ACTIVATION: 75
PACK TRAY ASSY, (FRAME, PACK): 5
LOWER CONTROL LINE SET (LINE, SUSPENSION CON): 75
HARNESS ASSY, 2K V5 (HARNESS CARGO, AERIAL): 165
CONTAINER, JPADS 2K (PACKTRAY, CARGO PARA): 75
CUT KNIFE, (KNIFE PARACHUTE REL): 1,000
LANYARD, AGU PULLCORD (LANYARD, ACTIVATION): 500
FLAP 3 & 8 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
FLAP 2 & 6 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
FLAP 4 & 7 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
HARNESS, MODULE INTERCONNECT, EXTERNAL (CABLE ASSEMBLY, SPEC): 75
RECOVERY BAG, JPADS 2K (BAG, CANOPY, RECOVERY): 50
DEPLOYMENT BAG, JPADS 2K (DEPLOYMENT BAG, PARA): 50
RETAINING LINE, UPPER, JPADS 2K (LINE, RETAINING UPPER): 125
FLAP 1 & 2 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
DROGUE BRIDLE, JPADS 2K (BRIDLE, PARACHUTE): 100
PARACHUTE, JPADS 2K (CANOPY, CARGO PARACHUTE): 25
D-BRAKE CLEAT (CLEAT, DEPLOYMENT): 25
SLIDER STOP ASSY, WITH LOOP (SLIDER STOP): 25
SLIDER, JPADS 2K (SLIDER, SAIL): 25
RETAINING LINE, LOWER, JPADS 2K (LINE RETAINING LOWER): 125
DROGUE, 46 (DROGUE, PARACHUTE): 75
SOFT LINK, 6 (SOFT LINKS): 100
DEPLOYMENT BAG, 46 DROGUE (DEPLOYMENT BAG, DROG): 100
Option Year 1 Quantity:
CABLE, ACTIVATION: 75
PACK TRAY ASSY, (FRAME, PACK): 5
LOWER CONTROL LINE SET (LINE, SUSPENSION CON): 75
HARNESS ASSY, 2K V5 (HARNESS CARGO, AERIAL): 165
CONTAINER, JPADS 2K (PACKTRAY, CARGO PARA): 75
CUT KNIFE, (KNIFE PARACHUTE REL): 1,000
LANYARD, AGU PULLCORD (LANYARD, ACTIVATION): 500
FLAP 3 & 8 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
FLAP 2 & 6 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
FLAP 4 & 7 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
HARNESS, MODULE INTERCONNECT, EXTERNAL (CABLE ASSEMBLY, SPEC): 75
RECOVERY BAG, JPADS 2K (BAG, CANOPY, RECOVERY): 50
DEPLOYMENT BAG, JPADS 2K (DEPLOYMENT BAG, PARA): 50
RETAINING LINE, UPPER, JPADS 2K (LINE, RETAINING UPPER): 125
FLAP 1 & 2 ASSY, 2K D-BAG (FLAP, DEPLOYMENT BAG): 25
DROGUE BRIDLE, JPADS 2K (BRIDLE, PARACHUTE): 100
PARACHUTE, JPADS 2K (CANOPY, CARGO PARACHUTE): 25
D-BRAKE CLEAT (CLEAT, DEPLOYMENT): 25
SLIDER STOP ASSY, WITH LOOP (SLIDER STOP): 25
SLIDER, JPADS 2K (SLIDER, SAIL): 25
RETAINING LINE, LOWER, JPADS 2K (LINE RETAINING LOWER): 125
DROGUE, 46 (DROGUE, PARACHUTE): 75
SOFT LINK, 6 (SOFT LINKS): 100
DEPLOYMENT BAG, 46 DROGUE (DEPLOYMENT BAG, DROG): 100
NAICS: 336413
Procurement is Full & Open
Technical Data Package (TDP):
Distribution Level: A
A signed non-disclosure agreement (NDA) is required in order to be considered responsive for the proposal. A signed NDA allows the offeror to receive the most up-to-date technical data package (TDP).
In addition to the requirements of CS6334 “Technical Data Package Information”, in order to receive the TDP, all bidders are required to execute a Use and Non-Disclosure Agreement (NDA) binding each bidder to the terms and conditions of the agreement, uploaded to HTTPS://Beta.SAM.gov (FBO has transitioned to Beta.SAM.gov). An official authorized to legally bind the company must sign the NDA. Upon execution of the NDA, it must be returned to [email protected] . Upon receipt of the signed NDA, the technical data will either be released on HTTPS://Beta.SAM.gov or the complete zipped file drawings will be sent via email upon approval through DoD Safe Site. (With the transition from FBO to Beta.SAM.gov, the site has been experiencing a number of issues.) Your firm must request access to the TDP in HTTPS://Beta.SAM.gov in addition to submitting the NDA in order to receive the TDP. Once these requirements have successfully been completed, you will be granted access to the TDP. The TDP was approved on 02 May 2019.
Federal Acquisition Regulation (FAR) Clause 52.246-11 Higher Level Contract Quality System is required. Contractor must be ISO 9001:2015 compliant.
First Article Test (FAT) is required for all 24 spare parts. Request for a FAT waiver may be approved. FAT waiver must be submitted with your proposal in accordance with Section L, LS7304, Provision for Waiver of Required First Article Approval. Use Attachment 0001 FAT Waiver Worksheet with your request.
MIL-STD 1916 is required, see Section E, ES6019.
All responsible sources may submit a quote which, if timely received, shall be considered. Proposals must be submitted via email to the Contract Specialist, [email protected] with the subject header: Proposal Submission – W56HZV-20-R-0022 (Company Name). Once a proposal is received, the Contract Specialist will reply to the respective offeror stating receipt of proposal submission.