Federal Bid

Last Updated on 01 May 2024 at 3 PM
Combined Synopsis/Solicitation
Miami Florida

JTF GTMO Camp System _ OLIVE

Solicitation ID PAN41024P0000000341
Posted Date 01 May 2024 at 3 PM
Archive Date 18 May 2024 at 4 AM
NAICS Category
Product Service Code
Set Aside 8(a) Sole Source (FAR 19.8)
Contracting Office 0410 Aq Hq Contract
Agency Department Of Defense
Location Miami Florida United states 33172

SPECIAL NOTICE:  THIS IS A SOLE SOURCE REQUIREMENT

The contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to complete a site survey to identify what is required to integrate and maintain the OLIVE system within the JTF J2 IT systems environment at the United States Naval Base Guantanamo Bay (GTMO), CUBA, in accordance with the unique mission requirements.

Pre-Site Survey: The contractor shall coordinate directly with the J21-GTMO team of the United States Southern Command.  Pre-Site Survey (continued): The contractor shall participate in meetings with the J21 GTMO Program Director, Mr. Chris Bridges.  These meetings shall be conducted on both classified and unclassified communication platforms.   The contractor shall possess the capability to meet virtually in all classification levels up to Top Secret / SCI. 

Site Survey: The contractor shall report to the GTMO OCONUS work location, survey the physical, environmental (cooling), power, technical (network, hardware, software, data storage), maintenance, support, and staffing requirements to integrate and maintain an OLIVE system to ingest existing Collection sources and process using OLIVE’s analytic capabilities, alerting, and data storage. The contractor shall travel to the work location the day prior to beginning the site survey, complete the survey across the next two working days and depart the work location the following day or later, at the next availability of government provided transportation depending on government needs and travel availability.

Post Site Survey:  The contractor shall furnish two products to the government.  The first product shall consist of the following: 1.) a feasibility study on implementation of OLIVE system integration 2.) an analysis and presentation of various solution course of actions (COA’s).  The second product shall be a detail rough order of magnitude (ROM), of the various costs by time and materials of each COA from the first deliverable.

Bid Protests Not Available

Similar Past Bids

Location Unknown 26 Dec 2024 at 6 PM
Location Unknown 24 Dec 2024 at 3 PM
Location Unknown 26 Aug 2021 at 6 PM
Location Unknown 07 Sep 2022 at 6 PM
Location Unknown 23 Jan 2025 at 11 PM

Similar Opportunities

Oklahoma 27 Jul 2025 at 4 AM (estimated)
Oklahoma 27 Jul 2025 at 4 AM (estimated)
Oklahoma 27 Jul 2025 at 4 AM (estimated)
Creve coeur Missouri 15 Jul 2025 at 1 PM (estimated)
Location Unknown 30 Sep 2025 at 4 AM (estimated)