The scope of work consists of roadway widening, restriping, and sidewalk installation along Waimea Canyon Drive and restriping and widening of Kaumualii Highway at the intersection to provide auxiliary lanes for left turns, relocation of overhead utilities and drainage structures, new traffic signals, curb ramps, and pavement striping.
Bid Protests Not Available