Supply all labor, materials, equipment and supervision to replumb both houses in the basement and the first floor. Replumbing the second floor is not part of the scope. The basements will be replumbed with 4 inch ABS Pipe and the first floor with 2 inch ABS Pipe.
Bid Protests Not Available