Point Of Contact Not Available
The work to be performed consists, in general, of repairing the Kern River Canalâs two (2) existing headgates. The work includes the removal the headgates, end âAâ frames, and mounting brackets; blasting clean the headgates and replacing the corroded areas of both gates; hot dip galvanizing all components; and reinstalling the gates with new seals. Contractor shall be responsible for all required dewatering. ENGINEERâS ESTIMATE: $80,000. The Kern River Canal headgates are located near the intersection of Coffee Road and Truxtun Avenue. All questions regarding this project must be directed to Jason Meadors, Water Resources Department, at 661-326-3715 or by facsimile to 661-852-2127.
Bid Protests Not Available