THIS AMEDNMENT-2 IS BEING POSTED TO CLARIFY THE RESPONSE DATE OF 24 APRIL 2018 12 PM CST
This requirement is for production of ten (10) additional complete LIMWS production representative B-Kit prototypes that will have an even distribution delivery schedule between December 2018 and April 2019, conduct of a delta Critical Design Review (CDR), installation of a LIMWS A-kit for risk reduction development testing, retrofit of A-kits based on risk reduction development testing, three (3) additional digital system model deliveries, and four (4) engineers (test, systems, algorithm, and field) to support eight (8) USG test events that average six (6) weeks each.