State Bid

Last Updated on 14 Aug 2023 at 4 AM
RFP
Bryan Texas

Luther Street Rehabilitation from Penberthy Blvd to Marion Pugh Dr.

Solicitation ID RFP (CSP) 23-088
Posted Date 14 Aug 2023 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Bryan
Location Bryan Texas United states
Point Of Contact Not Available
The project involves the construction of approximately 1,500 linear feet of improvements of Luther Street from Marion Pugh Boulevard to Penberthy Boulevard. These improvements will consist of removal and replacement of the existing roadway pavement, addition of sidewalk, installation of a storm drain system, replacement of the existing 16-inch DIP water main from Penberthy Boulevard to Sienna Drive. The proposed storm drain system will connect to the existing storm drain system approximately 700’ to the south of Luther Street in Marion Pugh Boulevard. All proposals shall follow the format provided by the City of College Station. The City is seeking a construction company with quality experience in road and utility reconstruction. Project Estimate: 2,000,000.00
Bid Protests Not Available