State Bid

Last Updated on 19 Jul 2023 at 4 AM
bid
San jacinto California

Lyon Avenue Sidewalk (Phase 1) Project and Tahquitz Sewer Mainline Replacement (Tahquitz) Project

Solicitation ID Not Specified
Posted Date 19 Jul 2023 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency San Jacinto
Location San jacinto California United states
The project’s general work occurs in two physically separated locations. Tahquitz Mainline Sewer Replacement consists of the removal and reconstruction of the existing sewer system in Tahquitz Street and adjacent alley Lyon Avenue Sidewalk (Phase 1) consists of the construction of curb ramp, sidewalk and local drainage along Lyon Avenue near Appaloosa Drive. As part of the work the Contractor shall furnish all labor, technical and professional services, supervision, materials, equipment, tools, and incidentals as required by the Plans, Specifications, and Contract Documents. *** NOTE - The award of the Contract, if made by the Owner through action of the City Council, will be to the lowest responsive responsible bidder, based on the lowest total of the bid prices on Bid Schedule No.1 plus Bid Schedule No. 2. The Bid Schedule included in the Contract Documents must be filled out, signed, and uploaded to be considered. The signed bid schedule is the basis for determining lowest responsible and responsive bidder and control over the line item tab where conflicts exist. Failure to provide a signed copy of the Bid Schedule will result in the rejection of the bid. ***
Bid Protests Not Available

Similar Past Bids

San jacinto California 11 Feb 2020 at 12 AM
San jacinto California 12 Feb 2020 at 2 AM
Southeastern Pennsylvania Not Specified
Location Unknown 16 Mar 2010 at 1 PM
Kansas Not Specified

Similar Opportunities

Lyons Georgia 16 Jul 2025 at 3 PM
Reno Nevada 16 Jul 2025 at 6 PM