The Pacific Northwest National Laboratory (PNNL) currently has a need for a contractor to confirm radiological contamination is not present in several facilities, including include the Physical Sciences Laboratory (PSL), Engineering Development Laboratory (EDL), and Life Sciences Laboratory 2 (LSL2)at the Richland, WA campus and the Marine Sciences Laboratory 1 and 5 (MSL1 and MSL5) at the Sequim, WA campus. The contractor is expected to provide turn-key services by planning, executing,and certifying that the facilities are free of contamination using NRC (2000), the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) process in conformance with United States Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment.
Bid Protests Not Available