Point Of Contact Not Available
This Contract provides for expansion and remodel of the Merrill Creek Operations Base (MCOB) Maintenance and Operations Building, Fuel Island Building, and Bus Wash Building located at 7000 and 7100 Hardeson Road, Everett, WA. Work includes, but is not limited to, upgrading and/or replacing concrete and asphalt paved areas, replacing trench drains with new storm water conveyance and detention systems, constructing a new storm water flow control facility, landscaping, relocating infrastructure at the Fuel Island Building, raising and reconstructing the roof on the Bus Wash Building, expanding the Maintenance and Operations building by approximately 19,207 square feet, including six (6) new additional maintenance bays, and relocating the body shop and paint booth. Existing vehicle lifts will be replaced with fourteen (14) Owner Furnished Owner Installed (OFOI) in-ground vehicle hoists. Construction requires working around 24/7 operational transit facilities. For continued Base operations during construction, the Work is divided into a series of five (5) phases, each of which is further defined by a set of minimum constraints intended to ensure continuous fleet maintenance operations, minimal disruption to transit operations, and provide access to and use of the worksite. Close coordination is required with Community Transit and its Construction Manager (CM) for all portions of the Work. Expected construction time is 36-40 months. Clarifying Questions must come through this portal. Please use the "CLARIFYING QUESTIONS" tab to submit any questions you have regarding this solicitation. Responses to all questions/requests not requiring an official Addendum (i.e. changes to the Bid Documents) will be posted under that same tab. NOTE: There are 9 folders to this ITB. See 'DOCUMENTS' tab for all Bid Documents, including any Addenda, Pre-Bid Sign-In Sheet, Bid Opening Summary, etc.
Bid Protests Not Available