The City of Garland is Requesting Bids on the construction of two trail connectors. First connector: Construction of 2,700 LF of a 12’ wide concrete trail at Glenbrook Dr. & Centerville Rd and a 3-span steel truss pedestrian bridge across Duck Creek. The second connector: Construction of 2,400 LF of a 12’ wide concrete trail at the northwest corner of westbound IH-30 frontage Rd and Greenbelt Pkwy and 1-span steel truss pedestrian bridge across Duck Creek for connection to Mesquite trail. Project also includes associated drainage, retaining walls, R-Rap slope protection and all incidentals. The Pre-Bid Conference will be conducted as a teleconference, please see the Activities tab for details. All questions must be submitted through Ionwave on the Questions tab. No emailed or faxed bids accepted.
Bid Protests Not Available