Federal Bid

Last Updated on 05 Aug 2020 at 4 PM
Solicitation
Tennessee

Microwave Surface Construction Capability

Solicitation ID MSCC2020
Posted Date 05 Aug 2020 at 4 PM
Archive Date 04 Sep 2020 at 4 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Nasa Marshall Space Flight Center
Agency National Aeronautics And Space Administration
Location Tennessee United states

Design, fabrication and implementation of a microwave heating device for the sintering/densification of lunar regolith simulant. This is to include the initial COTS based system (Phase I, FY 2021-2022) as well as the pre-flight prototype (Phase II, FY 2023-2024). It is anticipated that after these design phases, that the Contractor will be engaged in similar activities for a flight-ready system (Phase III, beyond FY 2024) that will be integrated into flyable platform.
These services will primarily focus on the design of the microwave hardware system.

Bid Protests Not Available