This project will consist of, but not be limited to, labor and material to demolish the building completely including the foundations, leave the excavation open and surrounded by snow fence in preparation for a follow-on construction project. The project scope includes specific salvage, utility work and owner performed work as indicated on the drawings by SAS dated September 2024. The project will be at the Ethan Allen Firing Range in Jericho, Vermont.
Bid Protests Not Available