State Bid

Last Updated on 10 Jun 2024 at 10 AM
RFA
Flagler beach Florida

Modifications to the Wickline Building

Solicitation ID 125
Posted Date 10 Jun 2024 at 10 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Flagler Beach
Location Flagler beach Florida United states
Summary of Work A. The Project consists of modifications to the Wickline Building, 800 S. Daytona Avenue, Flagler Beach, FL. 1. Men’s’ and Ladies’ Restrooms a. Do not remove any toilets or urinals except to install new flooring tiles, if required. Replace such to original location and condition. b. Remove all floor tiles, partitions, shoe molding, sinks and countertops, vanities, paper-towel dispensers, mirrors, and all other wall-hung accessories. Do not remove fire detectors. c. Remove and reuse existing toilet paper holders. d. Remove all ceiling tiles, grilles, fluorescent light fixtures, and exhaust fans. e. Paint existing ceiling grid. f. Supply and install new ceiling tiles. g. Supply and install new 2’x4’ LED lighting fixtures. h. Supply and install new exhaust fans. i. Supply and install new air intake and return grilles. j. Supply and install new partitions. k. Re-mount toilet paper dispensers. l. Supply and install new grab bars in handicap stalls. m. Supply and install new cultured marble sinks, spigots, and countertops. n. Supply and install under-sink pipe protection. o. Supply and install new mirrors. p. Supply and install new ceramic tile floors. q. Supply and install new shoe molding. r. Supply and install new toilet accessories: i. Combination paper towel dispensers; ii. Hand soap dispensers; s. Paint all walls, moldings, doors and trim. 2. Restroom Corridor a. Remove all ceiling tiles. b. Remove existing 2’x4’ fluorescent light fixture. c. Paint existing ceiling grid. d. Remove all shoe molding. e. Remove all floor tiles. f. Supply and install new ceramic floor tiles. g. Supply and install new ceramic transition tile. h. Supply and install new shoe molding. i. Paint all walls, moldings, doors and trim. 3. Building Corridor a. Supply and install new shoe molding. b. Paint shoe molding to match walls. 4. Exterior Railings a. Remove all existing railings, brackets, hangers, and hardware shown on drawings. b. Repair all walls and concrete surfaces where railings are removed. c. Power wash all surfaces where railings were removed including walls, concrete platforms, ramps, columns, and stairs. d. Supply and install new stainless-steel railings to include all new stainless-steel hardware, hangers, brackets, plates, etc. 5. Exterior Concrete a. Remove sidewalk concrete as shown on plans. b. Remove existing concrete blocks that support railing on south exit stairway. c. Repair any deteriorated concrete on the south landing, walls, and stair components. d. Reform and pour new sidewalk as shown on plans. 6. Exterior Painting a. Paint all concrete wall surfaces from ground to underside of roof structure. b. Paint all trim work around doors and windows. c. Paint all half-walls at stairways and handicap ramp. d. Paint all wood undersides of overhangs, conduits on the wall surfaces, and fasciae below the drip edges. e. Do NOT paint over city logos, signage, or camera mountings f. Do NOT paint any windows or doors.
Bid Protests Not Available

Similar Past Bids

Flagler beach Florida 10 Jun 2024 at 7 PM
Flagler beach Florida 30 Aug 2019 at 4 AM
Flagler beach Florida 30 Aug 2019 at 4 AM
Flagler beach Florida 16 Jan 2022 at 11 AM
Flagler beach Florida 30 Aug 2019 at 4 AM

Similar Opportunities

Colorado 15 Jul 2025 at 4 AM (estimated)
Colorado 15 Jul 2025 at 4 AM (estimated)
Georgia 11 Jul 2025 at 2 PM