This Request for a Proposal specifies the design, manufacture, test, delivery, and installation of the Double Multilayer Monochromator (DMM) System. The DMM system is expected to operate 24/6 for ~ 5,000 hours per year. Scope includes:
Note: Slit mechanism must not conflict with the canted beam path for the
11-ID-B and 11-ID-C beamlines.
4 .One vacuum chamber containing the UML with feedthroughs, and additional ports for later add-ons
5. One vacuum chamber containing the DML with feedthroughs, larger port for quick access, one port downstream of the
DML for a beam monitor, and additional ports for later add-ons
The monochromatic beam scattered by the monochromator of 11-ID-C must pass through the chamber and exit the
chamber through a window at its downstream end. The monochromatic beam scattered by the
monochromator of 11-ID-B must pass outside of the chamber, clearing the chamber by at least 75 mm.
6. Two support structures for the vacuum chambers.