This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
Procure and install a system to operate the ship lifting process in support the Synchrolift operation at the Ras El Tin Naval Base, Alexandria, Egypt. The ship lift operating system shall be new and current, meeting 2013/2014 standards.
Contract performance period will be 180 calendar days from notice to proceed. However, the installation and acceptance of the ship lift operating system must be accomplished during the specified Synchrolift outage between 15 May 2014 and 30 June 2014. The contractor shall coordinate their work to coincide with this outage so that there is no impact to the Synchrolift operation from this action. Consequently, an operational ship lift system must be in place, tested and accepted by 30 June 2014.