Project involves the maintenance dredging of federal navigation channels within Newport Bay Harbor. Dredging volume includes approximately 700,000 cubic yards of material suitable for ocean disposal to be placed at the LA-3 ODMDS and 160,000 cubic yards of material not suitable for ocean disposal to be placed within the Port of Long Beach Pier G Slip Fill Project. Project duration is 320 calendar days. Magnitude of Construction is $10,000,000-$25,000,000. This acquisition will be conducted under Federal Acquisition Regulation (FAR) Part 14 Sealed Bidding and is an Unrestricted procurement. The tentative date for issuance of the solicitation is on April 28, 2025, with a bid opening date of 28 May 2025. It is anticipated that contract award will be made withing 30 calendar days after receipt of bids. Solicitation documents will be available for downloading electronically and submission of bids will be done thru the PIEE website.