Nez Perce Clearwater NF, Red River Work Center Wastewater Electrical Distribution. Project consists of providing labor and materials for the removal and disposal of the distribution vault and meter pit piping, installation of a new magnetic flow meter, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and Installation of new electrical wiring and custom control for valve operation. The work includes, but is not limited to furnishing and installation of equipment, materials and related appurtenances, and providing all labor in the following general trades of work site work, excavation, trenching and backfill, piping, equipment installation and other related trades to complete the work. Project location from Grangeville, Idaho, located approximately 45 miles east on Hwy 14 to Elk City. Turn right onto the Red River Road NFSR 222 heading south for 10 miles to the Red River Administrative Site. See construction. Project completion September 17, 2021. Estimated price range between $100,000 - $250,000.