Point Of Contact Not Available
work consists of resurfacing. Work will include 1.5" HMA leveling course, a 2.0" HMA overlay, and a 2.0" mill and fill at the US 50 and SH 348 intersection. ADA ramps, traffic camera system installation, epoxy pavement marking, rumble strips, delinea...
Bid Protests Not Available