SOLE SOURCE JUSTIFICATION:
Upon the basis of the following justification, I, as Contracting Officer, hereby approve the use of other than full and open competition for the proposed contractual action pursuant to the authority of 10 U.S.C.2304(c)(1), FAR Subpart 6.302-1(a)(2)(iii), Only one responsible source and no other supplies or services will satisfy agency requirements.
JUSTIFICATION
1. Agency and Contracting Activity (FAR 6.303-2(a)(1)).
USDA, AGRICULTURAL RESEARCH SERVICE, Midwest Area, Columbia, MO location.
2. Nature/Description of Action(s) (FAR 6.303-2(a)(2)).
a. This contracting action is to obtain 32 bison heifers to be used for research purposes.
3. Description of Supplies/Services (FAR 6.303-2(a)(3)).
32 bison heifers, less than 10 months of age that have not been vaccinated with brucellosis vaccines and from a single herd free of malignant catarrhal fever (MCF). Heifers must have good eyes and be sound on feet and legs.
4. Identification of Statutory Authority (FAR 6.303-2(a)(4)).
10 U.S.C. 2304 (c)(1), FAR Subpart 6.302-1. The services required by the agency are available from only one responsible source and no other type of services will satisfy the Agency requirements.
5. Demonstration of Contractor's Unique Qualifications (FAR 6.303-2(a)(5)).
a. Only one responsible Source and No Other Supplies or Services will satisfy Agency Requirements (FAR 6.302-1(a)(2))
(1) FAR 6.302-1(a)(2) states,
"When the supplies or services required by the agency are available from only one responsible source, or for DOD, NASA, and the Coast Guard, from only one or a limited number of responsible sources, and no other type of supplies or services will satisfy agency requirements, full and open competition need not be provided for."
(2) The named vendor maintains NADC's bison genetic needs and is an agreeable travel distance from the Center. Transport time has to be at a minimum due to the temperament of the bison. Bison are needed for a vaccine experiment and previous vaccine experiments have utilized bison obtained from this vendor. Obtaining bison from a different source may introduce new variables to the ongoing experiments that may lead to increased variability in immune responses and impair comparison of vaccine responses across experiments. This herd is free of malignant catarrhal fever (MCF), a significant cause of mortality in many bison herds. Currently available diagnostics lack the sensitivity and specificity to detect infected herds or individuals. Purchase of bison with MCF would make all data from proposed experiment invalid and nonpublishable. Of equal concern would be the possibility that MCF could be inadvertently introduced into bison in other experiments (i.e. deer) at NADC; a scenario that would be devastating to several ongoing brucellosis, tuberculosis, and possibly prior research projects. A previous procurement of bison did result in procurement of MCF-positive bison.
6. Federal Business Opportunities - FedBizOpps.gov (FBO) Announcement/Potential Sources (FAR 6.303-2(a)(6).
a. A Federal Business Opportunities (FedBizOpps) synopsis is published in an attempt to identify other possible vendors of the required consumable.
b. USDA/ARS does not anticipate other qualified sources; however, should any responses be received, they will be evaluated to determine if they can meet future needs of the Government.
7. Determination of Fair and Reasonable Cost (FAR 6.303-2(a)(7).
After a thorough web search, no other suppliers were located that could supply this consumable.
8. Description of Market Research (FAR6.303-2 (a)(8).
USDA/ARS is constantly surveying the market and from this experience knows that the consumable is malignant catarrhal fever (MCF) free and only available from the vendor identified.
9. Any Other Supporting Facts (FAR 6.303-2(a)(9))
Due to the nature of the item needed to perform the research, at this time there is only one source available.
10. Listing of Interested Sources (FAR 6.303-2(a)(10).
No other sources are available at this time.
11. Actions Taken to Remove Barriers to Competition (FAR 6.303(a)(11)).
Vendor surveys are done from time to time to see if other existing items can meet the research requirements. If competition occurs in the future and maintaining genetic consistency is not required for a given experiment, testing of additional resource herds can be performed for environmental bacteria status. Other sources will be identified if they meet the requirements for transport. Transport time has to be at a minimum due to procurement of the animal.
12. Technical Requirements and Certifications; (FAR 6.303-1(b) and FAR 6.303-2(b)
I certify that the facts and representations under my cognizance which are included in this justification and which form a basis for this justification are complete and accurate.
CONTRACTING OFFICER CERTIFICATION: (FAR 6.303-1(A), 6.303-2(A)(12)
I certify that this justification is accurate and complete to the best of my knowledge and belief.
Name: Karen L. Reddick
Title: Contracting Officer