Point Of Contact Not Available
Bids are invited for all materials, labor, tolls, and services necessary to install and perform: • Removal of debris and minimal channel shaping and excavation necessary for positive drainage along approximately 3,655 linear feet of Trautman Bayou beginning at Highway 90 and ending at the CSX right-of-way. • Removal of 525 linear feet of existing 72-inch corrugated metal pipe around Magnolia Street and the placement of 107 linear feet of 72-inch reinforced concrete pipe along with two concrete rectangular headwalls.
Bid Protests Not Available