Major quantities for the Work include approximately: 1,900 CY Common Excavation 900 CY Organic Topsoil Borrow 50,000 SY Full Depth Bituminous Pavement Reclamation 12,750 Ton Bituminous Mixture 7,500 LF Remove and Replace Concrete Curb and Gutter 630 LF 12-inch - 27-inch RCP Storm Sewer 200 LF 4-inch - 6-inch Drain Tile 9 Each Construct Catch Basin 6,500 LF Epoxy Pavement Striping 4,500 SY Mineral Sod 50 Each Install Lighting Unit