Point Of Contact Not Available
Abandoned Mine Reclamation Project DeSale South Venango Township, Butler County Mandatory Pre-Bid Meeting: No Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 2 L.S. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Eighteen-Inch (18") Diameter, 300 L.F. Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Thirty-Six-Inch (36") Diameter, Stacked, 2,232 L.F. Grading, 87,000 C.Y. Planting - Tree Planting Bed Preparation, 9 ACRE Planting - Grass Seed Bed Preparation, 2 ACRE Planting - Tree Seedlings, 5,550 EACH
Bid Protests Not Available