1.3.1 Scope of Work: Street restoration of: -Industry Street (Oceanside Blvd. to approximately 560 feet west of El Camino Real); -Camelot Drive (Oceanside Blvd. to Industry Street); -Foussat Road (Oceanside Blvd. to Industry Street); -Garrison Street (Oceanside Blvd. to Industry Street); and -Residential streets in the Rancho Hermosa/ River Oaks Community -Residential Overlays (Various Locations) -AC Patching and Repairs (Various Locations) -Mission Avenue (Highway I-5 to Horne Avenue) - Additive Alternate. Street restoration will include a combination of Full Depth Reclamation, Base Repairs and Asphalt Concrete Overlays.
Bid Protests Not Available