The Project consists of constructing a Regional Uninterruptible Power Supply (UPS) system inside Power Building 8 including a DC battery room, UPS panel with associated equipment, HVAC upgrades, utility re-routing, power distribution panels, and SCADA integration. Work will also include installing new ductbanks to route conduit between adjacent facilities. The project also involves replacing aged 480v electrical equipment with use of temporary power during construction.
Bid Protests Not Available