Amendment 1: The Site Visit date is changed to 02/28/2023, 9:00 AM Mountain Time due to weather.
All other terms and conditions remain unchanged.
--------------------------------------------------------------------------------------------------------
The existing entrance ramp does not meet ADA standards.
1. The existing concrete entrance ramp will be replaced.
2. The current ADA parking spaces will be updated to current standards.
3. Damaged pavement in the parking lot will be repaired.
4. Failing entry doors will also be replaced and upgraded.
Refer to “A10 Attachment 3 SS DRAFT SOW Parking Lot Improvements Lower Brule” for a full draft copy of the scope of work.
Also attached are:
- B01 RFQ Parking Lot Improvements Lower Brule
- B01 Attachment 1 Wage Det SD20230022 6Jan2023
- B01 Attachment 2 LB Parking Lot Drawings
- B01 Attachment 3 GP21LB500C06-Maps and closest towns
- B01 Attachment 4 Self Performed Calculation Sheet (Construction)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the anticipated project magnitude is between $100,000 and $250,000.