State Bid

Last Updated on 09 Dec 2021 at 3 PM
IFB
Utah

Parowan Front Lop and Scatter

Solicitation ID AS22-60
Posted Date 09 Dec 2021 at 3 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency State Of Utah
Location Utah United states
Issuing Procurement Unit State of Utah Division of Purchasing Conducting Procurement Unit State of Utah Division of Wildlife Resources INVITATION FOR BIDS Parowan Front Lop and Scatter SOLICITATION #AS22-60 Pursuant to the Utah Procurement Code, participation in this solicitation is limited to prequalified contractors only. Bids or quotes submitted by a non-prequalified contractor will not be considered. If you are not on the current Pre-approved/Pre-qualified Vendor list for the State of Utah, please do not submit a bid. This Invitation for Bids "IFB" is issued in accordance with the State of Utah Procurement Code and the Utah Administrative Code. If any provision of this IFB conflicts with the Utah Procurement Code or the Utah Administrative Code, then Utah Procurement Code and then the Utah Administrative Code will take precedence. Purpose of this Solicitation The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide: wildfire hazard reduction and improved wildlife habitat by hand cutting (Lop and Scatter) standing live or dead Pinyon pine and Juniper trees and saplings. Closing date and time The closing date and time for this sourcing event are as provided in this posting. If your time is different from that shown, your profile may be set to a different time zone. Please see the attachment titled "Changing Your Time Zone" in the Buyer Attachments section for directions on how to update your profile. It is your responsibility to make sure you submit your response by the date and time indicated above. Bid Openings The bid opening for this solicitation will NOT take place in person. “Unofficial Results” will be posted to the solicitation in SciQuest after the solicitation has closed. The Unofficial Results DO NOT constitute an award for the bid. Unofficial Results are being uploaded online in order to promote fairness to all vendors, regardless of physical geographic location. SITE SPECIFICS: Location and Description: Work under this contract is in the Northeast of Cedar City, Utah along the frontage road east of I 15 from Summit Canyon to Parowan Canyon. Elevations range from 6,200 to 7,500 feet within the project site. Slopes range from flat to 35% with most of the project being less than 10%. The makeup of the project is 66% previously untreated acres and 34% maintenance of treatment acres within a prior chaining. The treatment boundaries are flagged and can additionally be located by GPS or by using the PDF maps attached and the Avenza app. The work location is shown on the general location and site maps. Acreage: 1,458 acres: Access to the site: Access onto the project site is provided by a combination of paved highways, county dirt surface roads and jeep trails. Four (4) wheel drive vehicles are recommended in and around the project area. It will be the contractor’s responsibility to get the equipment to the work site. SPECIFIC TASKS: Work Limits: Only areas shown on the Project Map will be treated. The project areas will be flagged but contractor will need to utilize either GPS units or smartphone applications capable of utilizing pdf’s to identify the work areas. A GIS/GPS shapefile will be provided prior to work beginning. Government staff will identify unit boundaries for the work executed under the contract. The Contractor shall immediately upon entering the project area, begin work, locate control points, section corners, and take such action to prevent their destruction. Cutting: This is a “lop and scatter” contract. All Pinyon Pine and Utah Juniper trees alive or dead within the project boundaries shall be completely severed from the stump(s). No live limbs shall be left on the stump of cut trees. All main branches or stems shall be cut from the trunk of the tree to meet scattering requirements Additional treatment specifications (applies to all cutting units): 1. Cut material will be lopped and scattered so that slash height does not exceed 24” above the ground. 2. Cut material left on site shall not exceed 48” in length. 3. Cut material will be spread in ephemeral washes and draws where possible to help reduce erosion. 4. Live browse species, shall not be cut or damaged. 5. Only established roads shall be used. No overland travel by vehicle will be allowed. 6. Any trees identified as bearing trees, or any tree blazed or tagged to mark the line of any Government survey, shall not be cut or destroyed under penalty of the law. Trees with reference tags will be left uncut. CONTRACTOR FURNISHED EQUIPMENT: Equipment Requirements: The Contractor shall furnish chainsaws on a fully-operational basis, with competent, fully-qualified operators, and shall meet the following specifications: 1. Must provide a minimum of a 10 man crew. 2. Be capable of cutting live or dead pinyon and juniper trees at six (6) inches above ground level on the uphill side. 3. Equipment shall be free of fluid leaks and be in good operating condition. 4. Equipment shall be washed before entering and exiting federal and state lands. All soil and plant parts shall be removed to prevent the spread of noxious weeds in and out of the project area. Contractor shall also furnish either GPS unit(s) or smartphone(s) with pdf map application to be utilized in identifying project boundaries. GOVERNMENT FURNISHED PROPERTY: No Government property shall be furnished on this project. This contract will result in one purchase order contract award to the lowest cost responsive and responsible bidder. Length of the Contract Project Performance Time: Project must be completed no later than May 20th, 2022. Issuing Procurement Unit, Conducting Procurement Unit, and Solicitation Number The State of Utah Division of Purchasing is the issuing procurement unit and the State of Utah Division of Wildlife Resources is the conducting procurement unit for this IFB (referred to as “the State”). The reference number for this IFB is Solicitation #AS22-60. This solicitation number must be referred to on all bids, correspondence, and documentation submitted to the State relating to this IFB. Additional Information: SITE VISIT: There will be no site visit for this contract. While there is not going to be a site visit help for this contract it is strongly recommended that each potential bidder ensure that he/she has a complete understanding of the requirements of this project. Bidders are urged to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. SHAPE FILES: For this project shape/KML file(s) are attached with this solicitation. Under no circumstances shall the shape/KML files be considered part of the contractual document. They will be provided for informational purposes only. Any .pdf files provided in this bid document, and the actual physical site location shall govern any contractual interpretation or dispute related to this project. Bidders are prohibited from communications regarding this IFB with the conducting procurement unit staff, evaluation committee members, or other associated individuals EXCEPT the State of Utah Division of Purchasing procurement officer overseeing this IFB. Wherever in this IFB an item is defined by using a trade name, brand name, or a manufacturer and/or model number, it is intended that the words, “or equivalent” apply; and invites the submission of equivalent products by the Bidders. Bidders may be required to submit product samples to assist the chief procurement officer or head of a procurement unit with independent procurement authority in evaluating whether a procurement item meets the specifications and other requirements set forth in the invitation to bid. Product samples must be furnished free of charge unless otherwise stated in the invitation for bids, and if not destroyed by testing, will upon written request within any deadline stated in the invitation for bids, be returned at the bidder's expense. Samples must be labeled or otherwise identified as specified in the invitation for bids by the procurement unit. Evaluation of Bids Each bid received shall be evaluated for responsiveness in as outlined in the Utah Procurement Code. This IFB shall be evaluated by the objective criteria described in this IFB. Bids submitted must comply with the prerequisites and questions sections of this IFB. Any bid that does not comply with the prerequisite and questions sections will be deemed non-responsive and will be rejected. Multiple or alternate bids will not be accepted, unless otherwise specifically required or allowed in the invitation for bids. If a bidder submits multiple or alternate bids that are not requested in this IFB, the chief procurement officer or head of a procurement unit with independent procurement authority will only accept the bidder's primary bid and will not accept any other bids constituting multiple or alternate bids. Any exceptions to the content of this IFB, including the prerequisites, must be protested in writing to the Division of Purchasing prior to the closing date. To be responsive and responsible Bidders must review and respond to the following sections of this IFB: Prerequisites, Buyer Attachments, Questions, and Items. The Prerequisites Section contains the objective criteria that will be used to evaluate the bids, including the mandatory minimum requirements and general requirements that Bidders must certify that they have read, understand, and agree to in order to submit a bid. The Buyer Attachments Section contains the required State of Utah Terms and Conditions of the IFB, which are non-negotiable, and other documents required for this IFB. The Questions Section contains the questions that Bidders are required to answer in order to submit a bid. The Items Section contains the detailed description of the procurement items being sought and allows the Bidders to provide their bids. Bidders must review each section of this IFB carefully.
Bid Protests Not Available

Similar Past Bids

Utah 30 Sep 2021 at 10 PM
Utah 12 Nov 2021 at 2 PM
Utah 30 Nov 2021 at 6 PM
Utah 08 Dec 2021 at 11 PM
Utah 10 Dec 2021 at 9 PM