The equipment covered by these specifications shall be new and complete, not refurbished, with all standard equipment and accessories. Any item or accessory not mentioned in this specification, but required for operation of the unit, must be itemized and included in the bid. Any component identified as standard equipment must be furnished at no additional cost. The equipment shall conform in all respects to the Division of Industrial Safety Orders Cal/OSHA and California South Coast Air Quality Management District (SCAQMD). Plus, any other pertinent regulations. Bidder is required to furnish proof of certification/ compliance at time of receipt of equipment. This equipment shall meet or exceed noise emission limits applicable to Federal and Cal/ OSHA requirements for operators on (8) hours operation without hearing protection. All separate units shall be installed and connected for operation. Bidder shall furnish complete information on the equipment to be furnished. Information must include published literature indicating all standard and optional features. Only new, current production models will be considered.
Bid Protests Not Available