Point Of Contact Not Available
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Station 9+36.00 to Station 13+42.00: Remove and dispose of existing Asphalt Concrete, Aggregate Base and subgrade structural section to a depth of 1.35 feet, construct 0.80 foot depth of crush aggregate base, construct 0.40 foot depth of Asphalt Concrete (AC) section, construct 0.15 foot depth of Asphalt Rubber Hot Mix (ARHM) section. Station 26+45.00 to Station 30+99.00: Remove and dispose of existing Asphalt Concrete, Aggregate Base and subgrade structural section to a depth of 2.35 feet, construct 1.80 foot depth of crush aggregate base, construct 0.40 foot depth of Asphalt Concrete (AC) section, construct 0.15 foot depth of Asphalt Rubber Hot Mix (ARHM) section. Adjust various facilities to grade, install traffic striping, pavement markers and legends and appurtenance work that was not mentioned above but is required by the projectâs plans and specifications. The majority of this work shall be performed at night.
Bid Protests Not Available