Federal Bid

Last Updated on 03 Jul 2019 at 8 AM
Combined Synopsis/Solicitation
Location Unknown

PHOENIX LIGHTING

Solicitation ID PCJCC-2012-PHL
Posted Date 26 Oct 2012 at 1 PM
Archive Date 03 Jul 2019 at 5 AM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Atlanta
Agency Department Of Labor
Location United states
 

ResCare, Inc.

Pinellas County Job Corps Center

Request for Proposal

RFP# PCJCC-2012-PHL

Interested Bidder must attend a Walk Thru 

Thursday, August 9th at 2pm

Bids will be received until 5:00 PM on:

Thursday, August 30th

 

NOTE:  If you are unable to quote, please notify the center (contact information is below). 

 

This RFP does not commit ResCare to pay any costs incurred in the preparation of a proposal, nor does it commit ResCare to award a contract for products, supplies or services.  ResCare will be the sole judge as to which bid offers the best overall value and will serve the best interest of ResCare. ResCare reserves the right to reject any and all bids without recourse from bidders.

 

Mark Envelope with: RFP# PCJCC-2012-PHL

Deliver or mail to:

Vivian Lopez, Purchasing Officer

Pinellas County Job Corps Center

500 22nd Street South

St. Petersburg FL 33712

Phone:   (727) 551-2939

E-mail: [email protected]

 

 

 

 

 

 

 

OFFER TO:  ResCare Inc., Pinellas County Job Corps Center.

 

In compliance with the Bid Provision, Scope of Work, Terms and Conditions, and other specifications contained in this RFP, the undersigned hereby proposes to provide Services for the center listed above.

 

 

 

Contractor must provide a cost break down of sheet of   labor, material, bond   and overhead budget.

 

 

Any additional charges for services or products that are not included in the above rates will be listed below:

 

_______________________________________________________________________________________

_______________________________________________________________________________________

 

Respectfully submitted,

 

 

Signature: _______________________________

 

 

Printed Name: ____________________________

 

 

Date: ___________________________________

 

 

Company Name: ____________________________

(if applicable)

 

Address: __________________________________

 

 

__________________________________________

 

 

Phone: ____________________________________

Request for Proposal

Solicitation No: RFP# PCJCC-2012-PHL

Service:           Electrical service

 

The Pinellas County Job  Corps  Center  is  soliciting  bids  for  the  performance  of   install Electrical  installation  at  the Saint  Petersburg  Location.

Scope of Work

CRA Project:  Phoenix Park Lighting and Power

 

  1. POWER
    1. PCJCC to provide the only following materials:

                                                              i.      Three 100 amp three phase NEMA 3R load centers 208/120 volts.

                                                            ii.      One (1) - Eight (8) pole lighting contactor with weatherproof enclosure

                                                          iii.      One (1) - Single pole single throw 120 volt time clock (To control lighting contactor coil)

                                                          iv.      2 - 2 pole 30 amp breakers (for each LC)

                                                            v.      2 - 2pole 20 amp breakers (for each LC)

                                                          vi.      4 - single pole 20 amp breakers (for each LC)

 

 

SCOPE OF WORK:

  1.  
    1. Building #8:  Power to be pulled off building #8 for Installation of 100amp load center 3 phase 208/120v, contactor and time clock to SW corner of Phoenix Park.  This is to accommodate (8) eight 2-head 400watt MH fixtures mounted on concrete light poles.  Each pole will be provided with a duplex GFCI receptacle at level to be determined by PCJCC.   Pole spacing will be agreed to between PCJCC and contractor.

 

 

  1.  
    1. Building #6:  Install 100amp load center 3 phase 208/120v on exterior wall of electrical room.
    2. Building #5:  Install 100amp load center 3 phase 208/120v on block wall built by PCJCC (West side of building #5).  Fed from electrical room in building #5.

NOTE:  TBD -cameras will be installed on poles.  Conduit is needed to be installed on light poles to accommodate wiring. Cost of conduit should also be included separately.  Size of conduit TBD.

 

 

ALL BIDDERS WILL BE PROVIDED THE OPPORTUNITY TO FIELD INSPECT AND MEASURE THE ABOVE SCOPE OF WORK.

 

 

Bid Protests Not Available

Similar Past Bids

Location Unknown 10 Oct 2012 at 7 PM
Location Unknown 27 Apr 2012 at 3 PM
Location Unknown 25 Jul 2012 at 1 PM
Little rock South carolina 25 Mar 2014 at 5 PM
Location Unknown 10 Jul 2012 at 3 PM

Similar Opportunities

No Similar Opportunities Found