The Scope of Work for the Pinewood Forest Project shall consist of mobilization of the contractor’s workforce and equipment, construction site preparation, installation of erosion and sediment controls, maintenance work on a drainage ditch to establish water flow and establish drainage control, installation of an underdrain structure, construction site surveys, excavation and regrading as necessary, revegetation, and clean up and repair of damage to the project site.
Bid Protests Not Available