THE CASINO REVEGETATION PROJECT INVOLVES PROCURING AND APPLYING SOIL AMENDMENTS, PLANTING TREES, SEEDING AND MULCHING THE CASINO MINE SITE. PREVIOUSLY, A CONCRETE WALL WAS INSTALLED TO SEPARATE THE MINE WASTE PILE FROM THE ADJACENT GULCH. THE MINE WASTE WAS GRADED AND RE-CONTOURED TO ALLOW POSITIVE DRAINAGE AWAY FROM THE PILE.
Bid Protests Not Available