THE PEEKABOO PROJECT CONSISTS OF TWENTY-FIVE (25) HAZARDOUS MINE OPENINGS; 14 ADITS AND 11 SHAFTS. THE HAZARDS WILL BE SAFEGUARDED USING VARIOUS CLOSURE METHODS INCLUDING GRATED ADIT CLOSURES, POLYURETHANE FOAM, CORRUGATED STEEL PIPES AND BACKFILLING. EIGHT OF THE ADITS WILL RECEIVE BAT GATES.
Bid Protests Not Available