The contractor shall furnish all labor, supervision, tools, equipment, transportation, material and incidentals necessary for each type of POL. The contractor is responsible for providing the POL as well as delivery and haul away.
A. 7,000 Gallons AVGAS (100LL) Mobile refueling units equipped with filters and issue totalizer meters that are capable of refueling through either single point connection or open port. All fuel support vehicles, equipment, and manpower will be onsite and remain on site prior to the start of Air Expo flying and until the last required aircraft servicing for each day of the Air Expo.
B. Smoke oil not to exceed 1,800 gallons. All unused smoke oil and containers must be picked up and transported off Beale AFB. Acceptable examples listed in SON
C. AeroShell W100 is required not to exceed 40 Liters. AeroShell W120 is required not to exceed 200 liters.
All remaining quantities must be picked up and transported off Beale AFB. AVGAS (100LL), Smoke Oil, and Aircraft Engine Oil must all be delivered to Beale AFB prior to the start of the Air Expo. All fuel support vehicles, equipment, and manpower will be on-site prior to the start of the Air Expo and remain on-site until the last required aircraft has been serviced for each day of the Air Expo.
Please provide any suggestions or requests if you feel a more appropriate NAICS code exists. See the attached Statement of Need and Sources Sought for further details.
Additionally, please fill out and email me the attached Sources Sought form.