USDA APHIS Veterinary Services Cattle Fever Tick Eradication Program (CFTEP) in Del Rio, TX requests quotations for site prep, supply and installation of a prefabricated building to be used as a workshop for USDA APHIS staff in accordance with the attached specifications.
The magnitude of construction for this project is between $25,000 and $100,000. This requirement is set-aside 100% for small business. If you are interested in the requirement you must submit a quote by email to the Contracting Officer Bob Zeglin at
[email protected] by 3pm CST 8/27/2018. It is highly encouraged to coordinate a site visit with the local point of contact listed in the statement of work prior to submission of quotes.
Offers will be evaluated based on price, technical capability and past performance.
Bid Protests Not Available